Every workshop loses time. The question is how much, where and why. OEE (Overall Equipment Effectiveness) answers all three in a single figure, provided it is calculated correctly and you know how to break it down. Here is the formula, a complete example and the method for turning this figure into actions.
Key takeaways
- OEE = Availability × Performance × Quality. It measures the share of required time actually used to make good parts.
- Losses fall into six big families: breakdowns, setups, minor stoppages, reduced speed, scrap and startup losses.
- OEE is only useful per machine and per cause: a workshop average does not tell you what to fix.
What is OEE?
Overall Equipment Effectiveness (OEE, called TRS in French) compares the good output a machine actually produced with what it could have produced over the same required time (planned production time), at nominal speed and without defects. An OEE of 100% means no breakdowns, no slowdowns and no scrap.
It is calculated from three rates, each linked to a family of losses:
- Availability: run time ÷ required time. It drops with breakdowns, setups and changeovers.
- Performance: actual output ÷ possible output at nominal speed during run time. It drops with minor stoppages and slowdowns.
- Quality: good parts ÷ parts produced. It drops with scrap and rework.
The OEE formula
The second formula gives the same result and serves as a check: if the two calculations do not match, one of the data points is wrong (often the nominal speed or the part count).
Example of an OEE calculation over an 8-hour shift
A press runs over an 8-hour shift, that is 480 minutes of required time. Its nominal speed is one part per minute.
| Step | Data | Calculation | Result |
|---|---|---|---|
| Required time | 480 min | – | – |
| Stoppages (breakdown, setup) | 60 min | run time = 480 − 60 | 420 min |
| Availability | 420 ÷ 480 | 87.5% | |
| Parts produced | 357 | possible in 420 min: 420 | – |
| Performance | 357 ÷ 420 | 85% | |
| Good parts | 339 | 18 scrapped | – |
| Quality | 339 ÷ 357 | 95.0% | |
| OEE | 87.5% × 85% × 95% | 70.6% |
Check with the second formula: 339 good parts × 1 minute ÷ 480 minutes = 70.6%. The two calculations match.
On this shift, nearly 30% of the required time did not produce a good part. The breakdown tells you where to look: stoppages cost 12.5 points, the speed loss about 13 points and scrap less than 4.
Calculating OEE in Excel: the same table is easy to reproduce in a spreadsheet. The difficulty is not the formula but the reliability of the data entered: exact duration of stoppages, undeclared minor stoppages, up-to-date nominal speed.
The 6 big production losses
Taken from the TPM (Total Productive Maintenance) method, the six big losses explain the gap between 100% and your OEE:
| Loss | Examples | Rate affected |
|---|---|---|
| Breakdowns | Tool breakage, hydraulic failure, waiting for maintenance | Availability |
| Setups and changeovers | Tool change, material change, first adjustments | Availability |
| Minor stoppages | Jams, blocked sensor, waiting a few seconds for a part | Performance |
| Reduced speed | Speed deliberately lowered, wear, difficult material | Performance |
| Scrap and rework | Non-conforming parts in stable production | Quality |
| Startup losses | Rejected parts at startup or after a setup | Quality |
Minor stoppages and reduced speed are the most underestimated: too short to be noted by hand, they often weigh more than breakdowns over a week.
How to measure OEE reliably
An OEE calculated from end-of-shift declarations is almost always too optimistic. For it to support decisions, three conditions apply:
- Capture machine states automatically (running, stopped, speed) from the PLC or a sensor, so you do not depend on operators’ memory.
- Qualify stoppages with a simple cause, chosen from a short list, when they occur.
- Declare scrap at the workstation, with its reason.

Moving from measurement to action
Once OEE is reliable, the approach comes down to four steps:
- Rank the losses by machine and by cause over a meaningful period (two to four weeks).
- Start with the bottleneck: one OEE point gained on the machine that limits the flow benefits the whole workshop.
- Tackle the biggest cause: shorter changeover times (SMED method), preventive maintenance, standardized setups.
- Check the effect on OEE the following week, then move on to the next cause.

In Seganto, OEE is calculated automatically from the states sent back by the machines and the declarations from the shop floor. Machine supervision and statistics displays stoppages and their causes, and shop floor tracking lets operators declare progress, incidents and scrap at the workstation. To see how these losses weigh on your schedule, read our article on machine fleet monitoring.
Frequently asked questions about OEE
What is a good OEE?
An OEE of 85% is often cited as the benchmark for highly controlled series production. In many SME workshops, the first figures measured automatically are more likely to fall between 40% and 65%. The most useful thing is to track your own progress, machine by machine.
What is the difference between OEE, OOE and TEEP?
They share the same logic but not the same reference time. OEE relates to required time (opening time minus planned unavailability), OOE (Overall Operations Effectiveness) to opening time, and TEEP (Total Effective Equipment Performance) to total calendar time, 24 hours a day. So TEEP ≤ OOE ≤ OEE always holds.
Do machines need to be connected to calculate OEE?
No, you can start with manual declarations. But minor stoppages and slowdowns then escape measurement. Connecting the machines makes OEE more accurate and removes manual entry.
In summary
OEE turns production losses into a measurable figure, then into three rates that tell you where to act. Calculated machine by machine, with qualified stoppages and scrap declared at the workstation, it becomes the indicator that drives continuous improvement on the shop floor.